How the Keys plant actually works
The lift is the whole trick. Banks Lake sits roughly 280 feet above Franklin D. Roosevelt Lake, the reservoir behind Grand Coulee, held in the natural trough of the Grand Coulee itself, an old channel the Columbia carved during the last ice age. When the pumps run, they push river water up that climb into Banks Lake, where it waits to flow south through the Columbia Basin Project canals, and the Bureau of Reclamation, which owns and runs the dam, logs those flows.
Those six reversible units, added across the 1970s and early 1980s, change the arithmetic. When demand spikes and prices rise, water already sitting in Banks Lake can fall back through those units and generate, each one rated on the order of 50 megawatts, for a combined pull of roughly 300 megawatts at full tilt. That is modest next to Grand Coulee's main powerhouses, which together run on the order of 6,800 megawatts, but it is responsive power the operators can call on.
The honest math on what it moves
Start with the water, because that is what the plant was authorized to do. Banks Lake runs about 27 miles from Grand Coulee down toward Dry Falls, and the project it feeds irrigates roughly 670,000 acres of Columbia Basin farmland, well short of the million acres the original plan imagined. The pumping bill for that is real, since lifting that much water 280 feet takes a large share of power, which is why the pumps mostly run in spring and early summer when the river is high and demand is not.
Storage value is harder to pin down, and anyone who hands you a clean number is guessing. The six reversible units do not run as a daily battery the way a dedicated storage plant would, because irrigation deliveries, fish-flow rules on the Columbia, and reservoir targets come first. Generation from the Keys plant is a byproduct of a water machine, not its main product, and the public records from Reclamation and the Bonneville Power Administration reflect that.
An old battery against the new proposals
Closed-loop projects now being floated in Washington work on the same physics with a cleaner conscience about rivers. The most watched is the Goldendale Energy Storage Project, proposed on the slopes above the Columbia near the old aluminum smelter at Goldendale, which would cycle water between an upper and a lower reservoir, both newly built, at a capacity on the order of 1,200 megawatts. It is in federal licensing and has drawn strong objection from the Yakama Nation over cultural sites, so it is far from certain.
Set side by side, the two tell an honest story. The Keys plant proves the idea works and has for decades, but it is chained to irrigation and the river, so its grid value comes and goes with the season. A closed-loop plant would be free of those duties and could cycle on the grid's schedule, which is the whole pitch, but it has to be built from nothing, permitted through tribal and environmental review, and paid for before it moves a single kilowatt.
Worth watching this month
1. Reclamation's Columbia Basin Project operations updates, which show when the Banks Lake pumps are running and roughly how full the reservoir is, routine but the clearest window on the plant.
2. The Goldendale project's docket at the Federal Energy Regulatory Commission, where any new filing or schedule change would signal whether that closed-loop plan is moving or stalling.
3. BPA's rate and resource proceedings, which set the price signals that decide when running the Keys plant in reverse is worth it, mostly routine but occasionally consequential.
4. Washington's Clean Energy Transformation Act milestones toward the 2045 target, since long-duration storage is part of how the state expects to get there.
5. Snowpack and spring runoff reports for the upper Columbia, because a big water year changes how much the pumps run and how much headroom Banks Lake has.
Questions from readers
Is the Keys plant the same as a battery?
Not quite. It stores energy as water held high in Banks Lake and can give some back through its reversible units, but its first job is irrigation, so it cannot cycle on demand the way a dedicated storage plant can.
How much power can it generate?
Roughly 300 megawatts from its six reversible units at full output, on the order of 50 megawatts each. That is small beside Grand Coulee's main powerhouses but still useful fast power.
Does pumping use more power than it returns?
Yes. Like all pumped storage it is a net consumer of electricity, so the value is timing, not free energy. You pump when power is cheap and generate or deliver water when it is worth more.
Why build new closed-loop plants if this one exists?
Because the Keys plant is tied to river flows and irrigation duties, a purpose-built storage plant could cycle whenever the grid needs it. The tradeoff is cost, permitting, and years of construction before it earns anything.
Sources for this story
- U.S. Bureau of Reclamation, Grand Coulee Dam, The federal operator's own page on the dam and the John W. Keys III Pump-Generating Plant., www.usbr.gov/pn/grandcoulee
- Bonneville Power Administration, Federal power marketer for the Columbia River dams, with rate and market information that shapes when the plant runs., www.bpa.gov
- Federal Energy Regulatory Commission, hydropower licensing, Where pumped storage proposals like Goldendale are licensed and where their dockets can be tracked., www.ferc.gov/licensing/hydropower
- Washington State Department of Commerce, Clean Energy Transformation Act, State agency page on the 2045 clean electricity law that frames the demand for storage., www.commerce.wa.gov
- Rye Development, Goldendale Energy Storage Project, The developer's description of the proposed closed-loop pumped storage project above the Columbia., ryedevelopment.com