How the two dams actually work
Mossyrock is an arch dam, a curved wall of concrete that leans its load into the canyon walls, and at roughly 600 feet it is the tallest dam in the state, per Tacoma Power's own figures. Behind it sits Riffe Lake, a long storage reservoir named for a town the water covered. Mayfield Dam, a few miles downstream, is shorter and holds the smaller Mayfield Lake, and its job is as much to steady the river below as to generate.
Put together, the two powerhouses add up to a capacity on the order of 450 to 500 megawatts at last public report. Capacity is the most the dams can push at once, not what they make over a year, and that depends on how much water comes down the Cowlitz, which depends in turn on Cascade rain and snowpack. A wet winter and a deep snowpack mean a strong year. A dry one does not.
The honest math on what they deliver
A municipal utility like Tacoma Power serves a fixed set of customers, so the useful question is how much of their power the Cowlitz dams cover. The honest answer is a large share of the utility's own generation, but not the whole bill. Tacoma Power is also a preference customer of the Bonneville Power Administration, the federal agency that markets Columbia River hydropower, and it leans on that supply as well.
Year-to-year generation from the project swings with water, so any single annual figure would mislead. The pattern is what matters: in a wet year the dams carry more of the load and the utility buys less power, and in a dry year it is the reverse. Anyone who wants the actual numbers can find them in Tacoma Power and FERC filings, and they are worth reading as a range rather than a point.
What the license obliges on fish
Every turbine on the Cowlitz runs under a federal license from the Federal Energy Regulatory Commission, listed as Project No. 2016 in FERC's records and issued in the early 2000s out of a settlement with state and federal agencies and the Yakama Nation. That license is the reason the dams are not simply power machines. It ties the right to generate to a long list of duties for salmon and steelhead, the fish that once ran the whole river.
Because Mossyrock and Mayfield are far too tall for any fish ladder, the project relies on trap and haul: young fish are collected above the dams and carried downstream, and returning adults are trapped below and trucked back up. The license also funds two of the largest fish hatcheries in the state, the Cowlitz Salmon Hatchery and the Cowlitz Trout Hatchery, which the state wildlife agency runs on Tacoma Power's dollar. The yearly cost of all this runs into the millions, by the utility's own accounting, and it is a real line against the power the dams sell.
Riffe Lake, held low
For residents around Riffe Lake, the most visible fact about Mossyrock lately has nothing to do with fish. For years Tacoma Power has kept the reservoir drawn down below its full level, a precaution tied to dam-safety studies about whether the project could safely pass an extreme flood and withstand a large earthquake. A lower lake is a smaller load on the structure while that work is studied and addressed.
Drawdown is concrete in the way that matters to the valley: boat ramps that end short of the water, a smaller lake for a shorter season, and a standing question about when, or whether, full pool returns. It also trims the storage the system can hold back, which feeds into the power math above. Tacoma Power posts updates on the restriction and the underlying studies, and that is the page to watch if the lake is your summer.
Worth watching this month
1. FERC's eLibrary for Project No. 2016 is where any license amendment or compliance filing on the Cowlitz dams shows up, routine most months, but the first place a real change would appear.
2. Tacoma Power's dam-safety pages for the Riffe Lake level, worth checking before planning a trip, since the drawdown and its timeline can shift.
3. The state wildlife agency's Cowlitz hatchery and adult return counts through the fall, a routine seasonal number that signals whether the trap and haul is meeting its marks.
4. Public Utility Board agendas for Tacoma Power, where the rates and the project's fish spending are set in public and usually, but not always, without surprises.
5. Bonneville Power Administration rate and supply news, which matters because the share of the bill the Cowlitz dams do not cover leans on BPA.
Questions from readers
Which of the two dams is bigger?
Mossyrock, by a clear margin. It is the tallest dam in the state, holds the larger reservoir in Riffe Lake, and has the greater generating capacity. Mayfield sits downstream, is shorter, and does more to steady the river than to make power.
Why trap and haul fish instead of building a fish ladder?
The dams are far too tall for fish to climb any ladder. So the project collects young fish above the dams and carries them down, and traps returning adults below to truck them back up.
Do the Cowlitz dams cover my whole Tacoma Power bill?
No. They are a large share of the utility's own generation, but Tacoma Power also buys federal hydropower from the Bonneville Power Administration. The mix shifts with how wet the year is.
Who pays for the hatcheries and the fish work?
Tacoma Power funds it as a condition of its federal license, and the state wildlife agency operates the hatcheries. The yearly cost runs into the millions, by the utility's own accounting.
When does the federal license expire?
The current license dates from the early 2000s and runs a multi-decade term, which puts its expiration roughly in the 2040s. The exact date is in FERC's records, and relicensing work would begin years ahead of it.
Sources for this story
- FERC eLibrary, Cowlitz River Project (P-2016), Federal government record of the project's license, amendments, and compliance filings; the primary public source for the license terms., elibrary.ferc.gov/eLibrary/search
- Tacoma Power, Cowlitz River hydroelectric project, The municipal utility's own description of Mossyrock and Mayfield, their capacity, and the fish program it funds., www.mytpu.org
- Washington Department of Fish and Wildlife, hatcheries, State government agency that runs the Cowlitz salmon and trout hatcheries and reports fish return counts., wdfw.wa.gov/species-habitats/hatcheries
- Bonneville Power Administration, Federal power marketer for Columbia River hydropower; context for the supply Tacoma Power buys beyond its own dams., www.bpa.gov
- Tacoma Public Utilities, Public Utility Board, Agendas and materials for the public board that sets Tacoma Power rates and oversees the project's spending., www.mytpu.org/about-tpu/leadership/public-utility-board