How a consortium builds a wind farm
Energy Northwest is a joint operating agency, a public corporation owned by its member utilities and created under Washington law. It does not chase profits on the open market the way a private developer does. For a project like Nine Canyon, the utilities that want the power sign long-term purchase contracts first, and those contracts are what back the bonds that pay for construction.
So the financing runs backward from the usual deal. Before the first turbine foundation went in, Energy Northwest lined up public utilities willing to commit to buying shares of the output for years. Those commitments, not a developer's balance sheet, made the project bankable, and because a public agency adds no profit margin, the power is sold at roughly the cost of building and running the plant.
Three phases, added in pieces
Nine Canyon came online in stages. The first phase started commercial operation around 2002, a second phase followed in about 2003, and a third, larger phase was added around 2008. At last public report the three phases together come to roughly 96 megawatts of nameplate capacity, which is a meaningful block for a cluster of small utilities, though wind output rises and falls with the weather and a nameplate figure is a ceiling, not a promise of what shows up any given hour.
Roughly a dozen public utility districts and municipal utilities across the Northwest signed up to take shares of the output, with the full participant list posted on Energy Northwest's own project pages. Several are small districts for which a single wind contract is a real slice of their power supply rather than a rounding error. If you want to know whether your utility is one of them, that participant list is the place to check, not a news summary.
Who bears the cost, who keeps the output
Because the utilities own the output through contracts, the cost lands on their ratepayers directly, spread across the customers of each participating district. There is no outside investor taking a cut, but there is also no investor to absorb a bad year. If the wind underperforms or a major repair runs long, the participating utilities, and in the end their customers, feel it on the power-supply line.
Control and price stability are the trade in return. A wind farm has almost no fuel cost, so once it is paid for, its output is cheap and predictable in a way that gas-fired power is not. For a small public utility district on a grid still shaped by Bonneville's federal hydropower, locking in a share of fixed-cost generation is a hedge against swings in the wholesale market. Whether that hedge pays off depends on how the plant ages and how wholesale prices move, and honest people read those odds differently.
Worth watching this month
1. Energy Northwest posts board and committee materials on its public calendar, so watch for any Nine Canyon operations, maintenance, or repowering item, most of which are routine housekeeping rather than news.
2. Bonneville Power Administration runs its rate and transmission proceedings on a published schedule at bpa.gov, and those set the wholesale backdrop against which a public-power wind contract looks cheap or not.
3. Participating utilities hold their own budget and rate hearings each year, where a district's share of Nine Canyon shows up as a line in its power-supply costs and is worth reading if you are that utility's customer.
4. Washington's Department of Commerce tracks utilities' progress toward the Clean Energy Transformation Act's 2045 all-clean target, so watch for the periodic compliance filings that show how projects like this count.
5. Wind in the Columbia Basin tends to run stronger in spring and summer, so a quiet, high-pressure winter stretch with little generation is normal seasonal behavior and not a sign the project is failing.
Questions from readers
Who actually owns Nine Canyon Wind?
Energy Northwest, a public power agency owned by its member utilities, built and operates it. A group of public utility districts and municipal utilities owns the output through long-term purchase contracts, with no private developer or shareholder in the middle.
Does buying from Nine Canyon make my bill cheaper?
It depends. A paid-for wind farm has almost no fuel cost, which can steady prices, but the ratepayers of the participating utilities carry the construction and maintenance costs directly, so the benefit tends to show up as price stability more than a guaranteed discount.
How big is it?
At last public report the three phases total roughly 96 megawatts of nameplate capacity. Actual output rises and falls with the wind and sits well below that figure most hours.
Can I check which utilities participate?
Yes. Energy Northwest lists the participating utilities and the three project phases on its Nine Canyon pages, which is the primary source for who signed up and when.
Is this the same as BPA power?
No. Bonneville markets federal hydropower across the region, while Nine Canyon is a separate, utility-owned wind project. The two meet on the same grid but are owned and paid for in different ways.
Sources for this story
- Energy Northwest, Nine Canyon Wind Project, The builder and operator's own pages, with the three phases, the capacity, and the list of participating public utilities., www.energy-northwest.com
- Bonneville Power Administration (bpa.gov), Federal power marketer and transmission operator; its rates and grid set the regional market Nine Canyon sells into., www.bpa.gov
- Washington State Department of Commerce, Clean Energy Transformation Act, State agency tracking utilities' path to 100 percent clean electricity by 2045, the rule a project like this helps meet., www.commerce.wa.gov
- Washington Utilities and Transportation Commission (utc.wa.gov), State regulator of investor-owned utilities; useful for seeing why public utility districts, which set rates through elected boards, are governed differently., www.utc.wa.gov