Why the wind farm sits on the wet side

Drive Interstate 5 south of Olympia toward Centralia and, on a clear break between storms, you can see blades turning above the hills to the east. They sit on logged and replanted ridgelines, the kind of ground most of Washington's wind map skips over. Almost all of the state's wind power stands far to the east, where the Columbia River Gorge funnels steady gusts past Goldendale and the Tri-Cities, and the southwest slopes near Centralia are softer and a good deal wetter.

So why build here. The honest reasons are practical, not about record wind speeds. The site is working timberland, already cut and road-served, so the project reused logging roads instead of carving new ones; it sits close to existing high-voltage lines; and the landowners were willing. At last public report the project runs roughly 38 turbines with a nameplate capacity of about 137 megawatts (nameplate is the most a plant can produce when everything is running flat out). It was developed by RES and is now owned by Southern Power, a Southern Company subsidiary, per the operator's own fact pages.

The honest math, and where the power goes

A wind farm on the maritime side will not match a Gorge project turbine for turbine, because the wind here is less steady. The figure that matters is the capacity factor, the share of a plant's maximum output it actually delivers over a year. Big Gorge projects often land somewhere around a third of nameplate; a damp, forest-edge ridge can run lower, and Skookumchuck does not yet have a long public operating record to settle the question. The honest answer shows up over time in the operator's filings and in Bonneville Power Administration transmission data, which a reader can check rather than take on faith.

Here is the part that surprises people near Centralia: the electrons mostly do not stay local. The output is contracted to Puget Sound Energy under a long-term purchase agreement, so the clean power largely serves customers to the north, in the Puget Sound suburbs, even though the turbines stand on hills in your line of sight. For PSE, the contract counts toward the Clean Energy Transformation Act, the 2019 state law (known as CETA) that requires Washington utilities to reach carbon-free electricity by 2045.

The coal plant down the road

The timing is hard to miss. A few miles from the turbines sits the TransAlta Centralia plant, the last coal-fired power station in Washington, which has been winding down for years. One unit stopped years ago, and the second was scheduled to burn its last coal by about the end of 2025. Whether that date held is something a reader can check in the company's and the state's recent filings.

The two are not a one-for-one swap, and it would be wrong to say the wind farm replaced the coal plant. They are different sizes and different kinds of power: the coal units could run on demand, the turbines run when the wind blows. What they do share is the corner of the grid. Both tie into the same transmission corridor that BPA and the utilities use to move power out of southwest Washington, so the clean energy and the retiring fossil capacity pass through the same wires.

Worth watching this month

1. TransAlta's Centralia plant was scheduled to stop burning coal by around the end of 2025, so watch late 2026 filings for confirmation that the final unit is offline.

2. Bonneville Power Administration posts transmission and interconnection records, worth checking for how Skookumchuck's output moves through the Centralia-area lines.

3. Puget Sound Energy's Clean Energy Implementation Plan at the state Utilities and Transportation Commission shows how contracts like this one count toward CETA, so watch for its next update.

4. EFSEC's docket list shows which large energy projects seek state-level siting, worth watching for any new southwest-Washington wind proposals that follow this one onto timberland.

Questions from readers

How big is Skookumchuck?

At last public report, about 137 megawatts across roughly 38 turbines. That is modest next to the big Columbia Gorge wind farms, which can each run several hundred megawatts.

Does the power stay in Centralia?

Mostly no. The output is contracted to Puget Sound Energy under a long-term agreement, so the clean energy largely serves customers to the north even though the turbines sit near Centralia.

Is the wind here as good as east of the Cascades?

Generally no. The maritime southwest slopes bring softer, less steady wind than the Gorge, which is why most of Washington's wind sits east. Developers chose this ridge for its logged, road-served land and nearby transmission, not for record wind speeds.

What is a capacity factor?

It is the share of a plant's maximum output it actually delivers over a year. A wind farm averaging a third of its nameplate rating runs at about a 33 percent capacity factor, and the real figure for this site shows up in operator and grid records over time.

Sources for this story

  1. Washington EFSEC (state energy siting council, .gov), Docket and project lists for large energy facilities; check which wind projects were sited through the state versus through county permits., www.efsec.wa.gov
  2. Bonneville Power Administration (federal power marketer and grid operator, .gov), Regional transmission and interconnection records for the Centralia-area grid., www.bpa.gov
  3. Washington State Department of Commerce, CETA (.gov), The Clean Energy Transformation Act and its 2045 carbon-free timeline for utilities., www.commerce.wa.gov
  4. Puget Sound Energy (utility, the project's power buyer), PSE's renewable portfolio and Clean Energy Implementation Plan, which count contracts like this toward CETA., www.pse.com
  5. Southern Power (project owner), Company fact pages listing capacity and turbine counts across its wind fleet, including Skookumchuck., www.southernpower.com