How a shared ground loop works
Picture a loop of water pipe buried below the frost line, running past a school, an apartment block, and a few houses. The ground a few feet down in western Washington sits at roughly the low to mid fifties Fahrenheit year round, per general geothermal references, warmer than the winter air and cooler than a July afternoon. Each building taps the loop with a heat pump, a device that moves heat rather than burning fuel, pulling warmth out of the water in winter and pushing waste heat back in summer.
What makes a network different from a single backyard loop is sharing. A grocery store rejecting heat from its coolers can warm the water a neighbor uses to heat a living room. In a maritime climate like ours, where the heating season is long and gray but rarely brutally cold, those modest, steady temperature swings are exactly what ground loops handle well. The hard part is not the physics. It is getting enough buildings on one block to sign on at once, and paying for the trench down the middle of the street.
What the 2024 law changed
House Bill 1589, passed in 2024, is the law most often cited here. Its headline effect is that Puget Sound Energy, the state's largest combined gas and electric utility, now files an integrated plan that looks at both systems together instead of pretending a gas customer and an electric customer live in different worlds. That matters for geothermal networks because a shared loop can let a neighborhood retire gas lines and shift to electric heat pumps without every household buying its own equipment.
That same wave of policy gave utilities a clearer path to propose thermal energy networks as pilots and to recover the cost through rates, subject to the commission's approval. Whether that path gets used, and where, is still being worked out in filings. Schedules in this kind of docket slip routinely, so treat any date you see as a target, not a promise.
Where to read it for yourself
Washington's Utilities and Transportation Commission, the state agency that regulates investor-owned utilities, keeps its dockets online. If you search Puget Sound Energy's integrated system planning and its gas-related filings, you can see how the utility describes any thermal network pilot, including rough maps of where it might go and how the loop would be sized. The documents are dense, but the cover letters and testimony summaries are written in something close to plain English.
Two things are worth checking when you open a filing. First, the location: a pilot near you is the only one that changes your bill or your block. Second, the cost recovery, meaning who pays for the loop, over how many years, and whether non-participating ratepayers are on the hook. Those are the questions the commission will press, and they are the ones worth your attention too.
Worth watching this month
1. Watch the Utilities and Transportation Commission docket list for any new Puget Sound Energy thermal energy network or integrated system plan filing, which can appear with little public fanfare.
2. Watch for public comment windows attached to those dockets, since the commission routinely opens a stretch of days for written comment before it decides.
3. Watch Puget Sound Energy's own integrated planning pages for a named pilot neighborhood, which would be the first concrete sign of where a loop might be dug.
4. Watch the state Department of Commerce for grant or technical assistance programs tied to thermal networks, which often move before a utility files.
5. Watch your own winter bills and any PSE notice about gas system planning in your area, the most local signal of all.
Questions from readers
What is a thermal energy network?
It is a shared underground water loop that heats and cools a cluster of buildings using the steady temperature of the ground and waste heat from the buildings themselves. Each building uses a heat pump to tap the loop instead of running its own furnace.
Does this exist in Washington today?
Not yet at any real scale. What exists are proposals and planning filings at the Utilities and Transportation Commission, so treat it as an idea being measured, not a system you can join.
Will it lower my bill?
It depends, and honestly no one can promise yet. The key questions are who pays for the shared loop and over how many years, which the commission reviews in each filing.
Why does the 2024 law matter?
House Bill 1589 told Puget Sound Energy to plan its gas and electric systems together and gave utilities a clearer path to propose thermal network pilots and recover the cost through rates.
How do I find the filings?
Search the Utilities and Transportation Commission's online docket system for Puget Sound Energy planning filings. The cover letters and testimony summaries are the most readable parts.
Sources for this story
- Washington Utilities and Transportation Commission (state regulator), The agency that reviews utility filings; search its docket system for Puget Sound Energy planning and any thermal network pilot., www.utc.wa.gov
- Washington State Legislature, House Bill 1589 (2024), The official bill page with text and history for the law directing combined gas and electric planning., app.leg.wa.gov/billsummary?BillNumber=1589&Year=2024
- Puget Sound Energy, system planning, The utility's own pages describing how it plans its gas and electric systems and any pilot proposals., www.pse.com
- Washington State Department of Commerce, energy programs, State grants and technical assistance that can support thermal networks ahead of a utility filing., www.commerce.wa.gov
- Bonneville Power Administration, The federal power marketer behind much of the region's electricity, useful context for electrification load., www.bpa.gov