How a turbine fits under a canopy

Building a turbine here starts with a flat pad, a crane path wide enough for blades that can run well over 150 feet each, and a road that a heavy-haul truck can climb loaded. On the rangeland east of the Cascades that road is cheap, a line scraped across open wheat ground. In a working forest, every one of those features has to be cut into standing timber or threaded along logging roads that were built for log trucks, not for hundred-ton crane components, which is why a plan that looks simple on the plateau turns into a much larger earthmoving job out here.

Then there is the timber itself. Operators leave setbacks between turbines and standing trees for wildfire risk, for ice thrown off blades in a Cascade winter, and for the plain fact that the forest around a turbine keeps growing and getting harvested on a cycle that can run several decades. A wind lease and a timber harvest plan end up sharing the same acres for the life of the project, which in this state is often figured at roughly 30 years or more, so the two uses have to be reconciled up front rather than sorted out later.

Habitat is the long pole

Two forest birds slow these projects more than the turbines do. The marbled murrelet, a small seabird that nests inland in mature and old forest, and the northern spotted owl are both listed under the federal Endangered Species Act, and both use the kind of stands that cover parts of the southwest slopes above the Columbia and the Willapa drainages.

Surveys for these species run across specific seasons and multiple years, not a single site visit, and that alone is one reason the siting clock is measured in years rather than months. Southwest Washington already has a cautionary example close to home: the Radar Ridge proposal on state forest land in Pacific County was dropped around 2011 after concerns about marbled murrelet habitat, and it is still the case people in these counties reach for when a new ridge gets mentioned.

Who has to say yes

Large energy projects in Washington can be reviewed by the Energy Facility Site Evaluation Council, the state body known as EFSEC that runs a single consolidated siting process, or by the county, depending on how the developer chooses to file. If the ground is state trust land, the Department of Natural Resources, which manages those working forests to fund schools and other beneficiaries, is also at the table, because a wind lease competes with timber revenue on the same acres.

Habitat questions pull in the U.S. Fish and Wildlife Service and the Washington Department of Fish and Wildlife, each with its own review. And because the power has to reach a market, a project also needs an interconnection agreement with the Bonneville Power Administration, the federal agency that owns most of the region's high-voltage backbone. Each of these parties can add a season, or a year, to the schedule, and none of them answers to the others, so the timeline is the sum of several separate clocks.

Worth watching this month

1. EFSEC's public case list at efsec.wa.gov is worth a monthly glance for any new southwest Washington wind filing; the check is routine, but a new case there would be the first real signal that something is moving.

2. Watch the Department of Natural Resources for any notice of a wind lease or right-of-way on state trust land in Pacific, Wahkiakum, or Lewis counties, which would mean timber and turbines are again being asked to share the same ground.

3. The U.S. Fish and Wildlife Service periodically updates marbled murrelet recovery and critical-habitat materials, and any change there tends to ripple into every forestland siting conversation in the region.

4. Bonneville Power Administration's interconnection queue shows where developers are asking to plug in, so a southwest Washington request there would say more than any press release.

5. Keep a loose eye on the Clean Energy Transformation Act milestones, including the 2030 interim target, since those legal deadlines are the slow pressure sitting behind all of this.

Questions from readers

Are there operating wind farms in southwest Washington's forests today?

Most of Washington's wind sits east of the Cascades on open rangeland and farm ground. Forestland wind on the southwest slopes is largely proposed or stalled rather than built, at last public report.

Why does siting take years instead of months?

Habitat surveys run across multiple seasons and years, several agencies review the same project on separate schedules, and the turbines have to coexist with active timber harvest. Those clocks add up rather than overlap.

What role does the marbled murrelet play?

It is an ESA-listed seabird that nests in mature inland forest. Its presence can force buffers or a redesign, and concern over its habitat helped end at least one local proposal in Pacific County.

Does any of this reach my electric bill?

Indirectly. The Clean Energy Transformation Act's clean-energy deadlines push utilities toward new renewable supply, and where that supply gets sited shapes cost and timing, though any single project's effect on your rate is small and slow.

Sources for this story

  1. Washington Energy Facility Site Evaluation Council (EFSEC), state siting body, The state's consolidated siting process and its public case list, where a large wind project's filings would appear., www.efsec.wa.gov
  2. Washington Department of Natural Resources (DNR), state agency, Manages state trust forests, including how a wind lease would be weighed against timber revenue on the same ground., www.dnr.wa.gov
  3. Bonneville Power Administration (BPA), federal power marketer and transmission owner, Owns most of the region's high-voltage grid; a project needs an interconnection agreement and shows up in its queue., www.bpa.gov
  4. U.S. Fish and Wildlife Service, marbled murrelet, federal agency, Recovery and critical-habitat information for the listed seabird that drives many forestland siting reviews., www.fws.gov/species/marbled-murrelet-brachyramphus-marmoratus
  5. Washington Department of Fish and Wildlife (WDFW), state agency, State habitat guidance and consultation on wind energy and listed species like the northern spotted owl., wdfw.wa.gov
  6. Washington State Department of Commerce, Clean Energy Transformation Act, state agency, Background on CETA, the law setting the 2030 and 2045 clean-electricity deadlines that motivate new projects., www.commerce.wa.gov/growing-the-economy/energy